How do you combine schedules in Revit?

How do you combine schedule columns in Revit?

Group Column Headings in a Schedule

  1. Open a schedule view.
  2. In the group header rows, drag the cursor across the headings to group. …
  3. Click Modify Schedule/Quantities tab Headers panel Group, or right-click the selected headings, and click Group Headers. …
  4. Enter text in the new row as necessary.

How do I merge a scheduled cell in Revit?

select one or more rows in the title section, then click (Resize Row) and specify a value in the dialog. select cells in one or more rows and click (Delete Row). select header cells to be merged and click (Merge). Select merged cells and click (Merge) again to separate merged cells.

How do you combine areas?

Combine Selected Areas



To combine overlapping or adjacent area features into a single area feature, first select the area features to combine and then select the Combine Selected Area Features right-click menu option. Any areas that are successfully joined into a new one will be marked as deleted.

What is an embedded schedule in Revit?

Use embedded schedules to display information about the components in rooms, spaces, duct systems, piping systems, or electrical circuits categories.

How do I unsplit a schedule in Revit?

You can rejoin the sections of a split schedule on a sheet. When you select the schedule on a sheet, a 4-way arrow control displays in the upper left corner of each section of the schedule. Use this arrow control to drag and drop a section of the schedule over another section to join them.

IT IS INTERESTING:  Will AutoCAD LT run on Windows 10?

How do you combine parameters in Revit?

Access the Combine Parameters dialog when creating or editing a schedule:

  1. To create a combined parameter, from the Schedule Properties dialog, click (Combine Parameters).
  2. To edit a combined parameter from the Schedule Properties dialog, select an existing combined parameter, and click (Edit parameter).

How do I edit a schedule in Revit?

select a cell or column in the schedule body. Click (Insert) on the Columns panel to open the Select Fields dialog, which functions like the Fields tab of the Schedule Properties dialog. Add new schedule fields and adjust the field order as needed.

How do I create a custom schedule in Revit?

Create a Key Schedule

  1. Click View tab Create panel Schedules drop-down Schedule/Quantities.
  2. In the New Schedule dialog, select the element category for which you want to schedule keys.
  3. Select Schedule keys. …
  4. Click OK.
  5. In the Schedule Properties dialog, add the predefined fields for the style. …
  6. Click OK.
Special Project