How do you change the base level in Revit?

How do you show project base point in Revit?

Display Coordinate Origin Points

  1. Open the desired view.
  2. Click View tab Graphics panel (Visibility/Graphics).
  3. On the Model Categories tab of the Visibility/Graphics dialog, scroll down to Site, and expand it.
  4. To display the project base point, select Project Base Point.
  5. To display the survey point, select Survey Point.

How do you manage levels in Revit?

Levels

  1. Set the Display to “Entire Project”.
  2. Set the Sort By to “Level”
  3. Set the filter to
  4. Select the elements you need to move.
  5. Look at the Properties palette for the Level property.
  6. If Level is an editable property for all elements, switch the level to the proper Level name.

Why are my levels not showing in Revit?

Select the tag for the section or elevation with the missing levels (or select the crop region within the affected view). In the Properties dialog click the button for Far Clipping. Select the No clip checkbox and click OK. If the No clip setting doesn’t lead to a solution, try selecting Clip with Line.

How do I move multiple levels in Revit?

To move the selected level up or down, click the temporary dimension, type a new value, and press ENTER . Drag the selected level line up or down. To move multiple level lines, select the desired number of level lines and move them up or down.

How do you move a project base point in Revit without moving a building?

Help

  1. In the site plan view or another view that displays the project base point, select the project base point.
  2. Drag the project base point to the desired location. …
  3. Optional: To ensure that the project base point does not move inadvertently, pin it in place by clicking Modify tab Modify panel (Pin).

How do I turn off coordinates in Revit 2020?

Use the Visibility / Graphic Overrides dialog to turn off display of the Internal Origin.



dyn.

  1. Open the Revit model in Revit 2020.2.
  2. Click Dynamo Player on Manage tab. …
  3. Click Edit Inputs command.
  4. Pick True to hide points.
  5. Click Run script.

Why is my visibility graphics greyed out in Revit?

If the Visibility/Graphic Overrides options are greyed out, it is because the file has a View Template attached. 1. Navigate to the Properties Palette in Revit.

How do you move project base point more than 10 miles?

If you are wanting to move the project base point to a new location outside of 10 miles from origin

  1. In 2020.2. 1 and earlier: Un-clip base point and use Relocate Project to move project base point.
  2. In 2020.2. 2 and later: Go to Manage > Coordinates > Specify Coordinates at Point.