Best answer: How do I reconnect a dimension in Solidworks?

How do I reattach a dimension in Solidworks?

To reattach a dangling center mark:

  1. Right-click the dangling center mark and click Reattach.
  2. In the same drawing view, select the hole edge, fillet, or slot whose center mark you want to reattach to the center mark set. The center mark reattaches to the new selection and the connection lines update.

How do you fix a dimension in Solidworks?

To set a fixed length:

  1. Select the spline to dimension.
  2. Click Smart Dimension (Dimensions/Relations toolbar) or Tools > Dimensions > Smart Dimensions.
  3. Click anywhere on the spline to place the dimension and click. …
  4. Drag an endpoint of the spline.

How do you reroute a dimension in Solidworks?

To change a dimension:

  1. Double-click a dimension. The Modify dialog box appears.
  2. Change the dimension value with the arrows, thumbwheel , mouse wheel, or by typing in the dimension box. …
  3. Choose from: …
  4. Use the buttons as follows:

How do you remove dangling dimension in Solidworks?

Information

  1. Open the master drawing in SOLIDWORKS. …
  2. From the SOLIDWORKS Menu select Tools>Options.
  3. Select the Document Properties tab.
  4. Select Detailing from the categories on the left.
  5. Locate the Hide dangling dimensions and annotations option and check the box next to it.
IT IS INTERESTING:  How do I import Gerber into KiCad?

Why are my dimensions yellow in Solidworks?

I have some drawing dimensions yellow? These particular dimensions are from a hole wizard feature. It’s fully defined in the part file. Use your SOLIDWORKS ID or 3DEXPERIENCE ID to log in.

How do you replace a part in a Solidworks drawing?

Replacing Model in a Drawing View

  1. Click Replace Model. (Drawing toolbar) or Tools > Replace Model.
  2. In the PropertyManager, under Selected Views, select a drawing view.
  3. Under New Model, browse to select a part or an assembly file, and click Open.
  4. Double-part icon. …
  5. Click .

How do you Foreshorten a dimension in SOLIDWORKS?

Right-click the side of the dimension to foreshorten and click Display Options > Foreshorten.

Why are my dimensions GREY in SOLIDWORKS?

Inserted dimensions are black and non inserted dimensions are grey, by default. These colors carry over to printouts while in Color Display Mode is on. When this mode is turned off, all colors are shown as system status (system defines the color based on their status instead of other settings).

How do I change dimension leaders in Solidworks?

In the Dimension Leaders PropertyManager, you can specify the display of dimensions. To open this PropertyManager: Select one or more dimensions, then click Leaders in the Dimension PropertyManager. If you select multiple dimensions, only the properties that apply to all the selected dimensions are available.

Why can’t ti delete dimensions solidworks?

If you single click on the dimension value, it provides a quick way to update the value. But this doesn’t allow the dimension to be deleted. Instead of clicking on the value, select one of the leaders or extension lines and then you can delete the dimension.

IT IS INTERESTING:  How do you change alignment in Revit?

How do I show hidden dimensions in Solidworks?

Hiding or Showing Annotations

on the Annotation toolbar, or click View > Hide/Show > Annotations . All annotations are displayed; hidden annotations are in gray. Click the annotations that you want to show or hide.

How do you hide sketch dimensions in Solidworks?

Easy Way to Hide/Show SOLIDWORKS Dimensions at Part Level

  1. In your FeatureManager Tree, right-click on the Annotations folder and select Show Feature Dimensions. …
  2. To keep only a certain number of dimensions, those that aren’t needed can be hidden by right-clicking on the dimension in the design space and selecting Hide.
Special Project