Your question: What is duplicate in Revit?

What does duplicate in Revit mean?

Duplicate creates a duplicate view with no annotations. ( doesn’t copy annotations) Duplicate with detailing creates a duplicate view including the annotations. The annotation after the “create” are independent of each other. ( Copies annotations, but doesn’t reflect new annotations to copied from view)

What is the difference between duplicate and duplicate with detailing in Revit?

The Duplicate option creates a duplicate view of the model elements within the view. The Duplicate with detailing option creates a duplicate view including the detail and annotations elements. They are independent from elements of the parent view.

What is duplicate as dependent Revit?

Duplicate as a Dependent creates a copy of the view and links it to the original (parent) view, as shown in the Project Browser below. View-specific changes made to the overall view, such as changing the Scale, are also reflected in the dependent (child) views and vice-versa.

IT IS INTERESTING:  How do i create a pmp file in autocad?

What is duplicate as Dependant?

Duplicate as Dependent

Duplicating as a dependent will create identical copies of the original view, the new views are also tied to the original view as child objects.

How do you duplicate a schedule in Revit?

Duplicate a Schedule

  1. Right-Click the schedule name in the Project Browser.
  2. In the context menu select Duplicate. Note: If the schedule has been split across sheets into segments, an additional selection will be available, Duplicate with Segments. This will duplicate the schedule and retain the segments created.

How do you duplicate a model in Revit?

Click Manage tab Design Options panel (Design Options). In the Design Options dialog, select the design option from the list. Under Option, click Duplicate. Revit creates a copy of the selected design option named Copy of <design option>.

How do you duplicate as independent in Revit?

You can convert a dependent view to an independent view. In the Project Browser, right-click a dependent view, and click Convert to independent view.

What would be the best workflow when using massing tools in Revit?

You can create wall, floor, or roof elements by modeling them using the create tools on the Architecture tab or by using the Model by Face tool on the Massing & Site tab. It is typically best to start by converting the mass floors in your conceptual model into Revit building elements.

How do you duplicate a floor in Revit?

Solution:

  1. Copy to Clipboard (CTRL+C) or from the Modify ribbon>Clipboard panel, choose Copy.
  2. On the Modify ribbon > Clipboard, click the drop down arrow under the Paste command.
  3. Select “Aligned to Selected Levels”
  4. Choose the Target level (i.e. Level 2)
  5. Switch to a 3D View to see the results.
IT IS INTERESTING:  How do i change the grid spacing in autocad?

How do you copy a view in Revit?

Copying Drafting Views & Schedules

  1. Select a drafting view or schedule in the project browser.
  2. Right-click and choose ‘Copy to Clipboard’

How do you create a dependent view in Revit?

Create Dependent Views

  1. In the Project Browser, select the view for which you want to create dependent views. …
  2. Click View tab Create panel Duplicate View drop-down Duplicate as Dependent, or right-click the view name, and click Duplicate View Duplicate as a Dependent.

How do I use a scope box in Revit?

Create a Scope Box

  1. In a plan view, click View tab Create panel (Scope Box).
  2. On the Options Bar, enter a name and specify a height for the scope box, if desired. …
  3. To draw a scope box, click in the upper left-hand corner to start the box.

What is a face based family?

Face-based. Use the face-based template to create work plane-based families that can modify their hosts. Families created from the template can make complex cuts in hosts. Instances of these families can be placed on any surface, regardless of its orientation. See Creating a Work Plane-based Family.

How do design options work in Revit?

On the Manage tab within Revit, select the Design Option button. Select the New button under Design Option Set to create a new option set called “Option Set 1”. The first option will be automatically created and will be called “Option 1 (primary).

Which view type can be used to add levels to a project?

Open the section or elevation view to add levels to. On the ribbon, click (Level). Place the cursor in the drawing area and click.

IT IS INTERESTING:  How do you publish an AutoCAD drawing?