How do I find the survey point in Revit?

To make these points visible:

  1. Click View tab > Graphics panel > Visibility/Graphics.
  2. On the Model Categories tab of the Visibility/Graphics dialog, scroll down to Site. …
  3. To display the project base point, select Project Base Point.
  4. To display the survey point, select Survey Point.

What is the survey point in Revit?

The survey point is used to correctly orient the building geometry in another coordinate system, such as the coordinate system used in a civil engineering application. In a Revit model, the survey point defines a reference point for the survey coordinate system.

How do you enter survey coordinates in Revit?

Define the Survey Point

  1. Open the site plan view or another view that displays it. …
  2. To select the survey point, move the cursor over the symbol and look at the tooltip or the status bar. …
  3. If the survey point is clipped, click to unclip it.
  4. Drag the survey point to the desired location.

How do you edit a survey point in Revit?

Move the Survey Point

  1. In the site plan view or another view that displays the survey point, select the survey point.
  2. Click the clip to change its state to clipped or unclipped, depending on how you want to move the survey point. …
  3. Drag the survey point to the desired location.
IT IS INTERESTING:  Quick Answer: How much RAM is enough for Ansys?

What is survey point and project base point in Revit?

Project Base Points and Survey Points. Every project has a project base point and a survey point , although they might not be visible in all views, because of visibility settings and view clippings. They cannot be deleted. The project base point defines the origin (0,0,0) of the project coordinate system.

What are the 3 points in Revit?

There are 3 different origin points in a Revit project: the Project Base Point, the Survey Point and the secret Internal Origin.

How do you find base points in Autocad?

In the Information area, click the Show Coordinates link. Click the Planimetry Fix Points tab to display the existing base points. Click the Planimetry New Points tab to display the new base points, such as a free station.

How do you set a base point in Revit?

To select the project base point, move the cursor over the symbol and look at the tooltip or the status bar. If it says Site: Survey Point, press Tab until it says Site: Project Base Point. Click to select the project base point. Drag the project base point to the desired location.