Question: How do you set up UCS in Revit?

The “UCS” is now a “WORK PLANE.” You can set it by clicking the “PLANE” icon in the upper left toolbar. If you have a massing model–which you will certainly need for this exercise, select the non-orthogonal plane by “picking plane” in the workplane dialog box.

Is there a UCS in Revit?

Revit does not have a “custom UCS” feature; it uses the Survey Point and the Project Base Point to coordinate models. See Shared Positioning in the Revit Help for further information.

How do you set up UCS?

To Specify a New UCS Orientation With Three Points

  1. Right-click the UCS icon, and click 3 Point.
  2. Specify a new origin point.
  3. Specify a point on the new positive X axis.
  4. Specify a point on the new XY plane.

How do you set units in Revit?

Set Project Units

  1. Click Manage tab Settings panel Project Units.
  2. In the Project Units dialog, select the discipline.
  3. Click the value in the Format column to change the display value for that unit type. …
  4. Specify Units, if necessary.
  5. For Rounding, select an appropriate value.
IT IS INTERESTING:  How do you make an AutoCAD file Uneditable?

How do you change axis in Revit?

Click and hold down the Orbit wedge. The cursor changes to the Orbit cursor. Drag to rotate the model. Release the mouse button to return to the wheel.

How do I get rid of UCS in Revit?

Solution. The solution was to simply turn off the appropriate Category in each view the icon appears in. In this case you would go to the views Visibility/Graphic Overrides of the particular view and turn off the ‘Internal Origin’ subcategory that appears under the ‘Site Category’.

How do you rotate a work view in Revit?

Click Modify tab Modify panel (Rotate). Note: If the Rotate tool is not available, in the Properties palette for the view, set Orientation to Project North. Rotate the view.

What is the use of UCS command?

Sets the origin and orientation of the current user coordinate system (UCS). The UCS is a moveable Cartesian coordinate system that establishes the XY work plane, horizontal and vertical directions, axes of rotation, and other useful geometric references.

How do you save UCS?

To Save a UCS Definition by Name

  1. Right-click the UCS icon, and click Named UCS Save.
  2. Enter a name. You can use up to 255 characters, including letters, digits, and the special characters dollar sign ($), hyphen (-), and underscore (_).

Where are settings in Revit?

To open the Settings dialog: In the Add-Ins tab Advance Steel Extension panel, click (Settings). Exports objects using the Revit view settings.

How do you set a base point in Revit?

Define the Project Base Point

  1. Open the site plan view or another view that displays it. …
  2. To select the project base point, move the cursor over the symbol and look at the tooltip or the status bar. …
  3. Drag the project base point to the desired location.
IT IS INTERESTING:  How do you align multiple models in Lumion?

How do you find a coordinate in Revit?

Display Coordinate Origin Points

  1. Open the desired view.
  2. Click View tab Graphics panel (Visibility/Graphics).
  3. On the Model Categories tab of the Visibility/Graphics dialog, scroll down to Site, and expand it.
  4. To display the project base point, select Project Base Point.
  5. To display the survey point, select Survey Point.

How do you move coordinates into Revit?

Relocate the Model by Specifying Coordinates

  1. Optional: Display the project base point and the survey point in the current view.
  2. Click Manage tab Project Location panel Coordinates drop-down (Specify Coordinates at Point).
  3. Place the cursor on a reference point of the model. …
  4. Click the reference.
Special Project