How do you plot coordinates in Revit?

How do I set project Coordinates in Revit?

Click Manage tab Project Location panel Coordinates drop-down (Specify Coordinates at Point). Place the cursor on a reference point of the model. A reference point can be the intersection of elements, such as the corner of 2 walls. In some types of views, you can use an edge as a reference.

Does Revit have coordinate system?

Revit uses 2 coordinate systems: a survey coordinate system and a project coordinate system. The survey coordinate system provides a real-world context for the building model. It is intended to describe locations on the surface of the earth.

How do you plot Northing and Easting Coordinates in Revit?

To Create Lines by Specifying Grid Northing/Easting Coordinates

  1. Click Home tab Draw panel Line drop-down Create Line By Grid Northing/Grid Easting Find.
  2. Enter a grid northing value.
  3. Enter a grid easting value. …
  4. Continue to enter grid northing and easting values to define the line segments.

Where is the survey point in Revit?

First, make sure that Survey Point is enabled in Visibility / Graphics settings. In Visibility / Graphics settings window go to Model Categories -> Visibility -> Site and make sure that “Survey Point” is enabled. After that in the Revit site view, the Survey Point block should appear.

IT IS INTERESTING:  Why do models disappear when zooming in SketchUp?

How do I set a survey elevation in Revit?

Move the Survey Point

  1. In the site plan view or another view that displays the survey point, select the survey point.
  2. Click the clip to change its state to clipped or unclipped, depending on how you want to move the survey point. …
  3. Drag the survey point to the desired location.

How do I set shared coordinates in Revit?

To do so, follow the instructions below or watch our short video.

  1. Open the model for which you want to bring the proper coordinates into.
  2. Turn on the visibility of the site points. …
  3. Create a new shared site and rename it. …
  4. Link in the model with the proper shared site reference. …
  5. Relocate your model.

What are the 3 points in Revit?

There are 3 different origin points in a Revit project: the Project Base Point, the Survey Point and the secret Internal Origin.

What is Survey point in Revit?

The survey point is used to correctly orient the building geometry in another coordinate system, such as the coordinate system used in a civil engineering application. In a Revit model, the survey point defines a reference point for the survey coordinate system.

How do you plot coordinates?

STEP 1 – Draw and label the x and y axis. STEP 2 – Plot the coordinates (2,3). Remember the x (horizontal) is the first number in the brackets and the y (vertical) is the second number. Now plot the rest of the coordinates.

How do you write Northing and Easting coordinates?

Notation and conventions



As a convention, the pair is typically represented easting first, northing second. For example, the peak of Mount Assiniboine (at 50°52′10″N 115°39′03″W / 50.86944°N 115.65083°W / 50.86944; -115.65083) in UTM Zone 11 is represented by 11U 594934 5636174 .

IT IS INTERESTING:  How long does SketchUp free last?

How do you find coordinates in CAD?

By default the Ribbon View tab > Coordinates panel is turned off. To show the panel, click the View tab then, right-click to the side of the available panels and click Show Panels > Coordinates. The Coordinates panel will be displayed.