How do you move a project base point in Revit without moving a building?

How do you unclip a project base point in Revit?

Define the Project Base Point

  1. Open the site plan view or another view that displays it. …
  2. To select the project base point, move the cursor over the symbol and look at the tooltip or the status bar. …
  3. If the project base point is clipped, click to unclip it.
  4. Drag the project base point to the desired location.

How do you unclip a project base point in Revit 2021?

You cannot delete the project base point. Project North defines the Y axis of the project base point. To ensure that the project base point does not move inadvertently, you can pin it by selecting the point and clicking Modify tab Modify panel (Pin).

How do you move an object freely in Revit?

Do one of the following:

  1. Select the elements to move, and then click Modify | tab Modify panel (Move).
  2. Click Modify tab Modify panel (Move), select the elements to move, and then press Enter .

How do you find a project base point in Revit?

Click View tab Graphics panel (Visibility/Graphics). On the Model Categories tab of the Visibility/Graphics dialog, scroll down to Site, and expand it. To display the project base point, select Project Base Point. To display the survey point, select Survey Point.

How do you move project base point more than 10 miles?

If you are wanting to move the project base point to a new location outside of 10 miles from origin

  1. In 2020.2. 1 and earlier: Un-clip base point and use Relocate Project to move project base point.
  2. In 2020.2. 2 and later: Go to Manage > Coordinates > Specify Coordinates at Point.

What is the meaning by specify base point?

basepointnoun. A point that marks the beginning and the end of a topological loop.

How do I turn off coordinates in Revit 2020?

Use the Visibility / Graphic Overrides dialog to turn off display of the Internal Origin.



dyn.

  1. Open the Revit model in Revit 2020.2.
  2. Click Dynamo Player on Manage tab. …
  3. Click Edit Inputs command.
  4. Pick True to hide points.
  5. Click Run script.

What is the method to georeference a Revit file?

Revit 2018 now has the option to use the Geo-Referenced data from a CAD file that was used to Acquire Coordinate data. When you link and position a Geo-Referenced CAD file, you use the Acquire Coordinates feature in Revit to share coordinate system data between the Revit and CAD file.

What are the 3 points in Revit?

3- The Spot Coordinates, Spot Elevation and Levels tools set to “Survey Point” don’t actually reference the Survey Point, they refer to the Shared Site Origin. 4- Set the Shared Site Origin and Survey Point early on in the project.

How do you move an object up in Revit?

Select the elements to move, and then click Modify | tab Modify panel (Move). Click Modify tab Modify panel (Move), select the elements to move, and then press Enter .

IT IS INTERESTING:  How do I add materials to AutoCAD 3D?
Special Project