How do you merge cells in Revit?

How do I merge columns in Revit schedule?

Group Column Headings in a Schedule

  1. Open a schedule view.
  2. In the group header rows, drag the cursor across the headings to group. …
  3. Click Modify Schedule/Quantities tab Headers panel Group, or right-click the selected headings, and click Group Headers. …
  4. Enter text in the new row as necessary.

How do you merge schedules in Revit?

Merge Split Schedules on Sheets

  1. On a sheet that displays a split schedule, select the schedule. Use the 4-way arrow control to drag one schedule segment over the other segment.
  2. Release the mouse button. The split schedule segments merge.

How do I split a cell in a schedule in Revit?

Split a Schedule on a Sheet

  1. Open the sheet.
  2. Select the schedule on the sheet. …
  3. Click the Z break control. …
  4. To split a section of the schedule further, click the Z break control again. …
  5. To adjust the number of rows in a section of the schedule, drag the blue dot at the bottom of the first section.

How do you change the schedule of multiple cells in Revit?

You can click and drag to select multiple rows, the switch to any model view or click on “show” on the option bar. The items you selected on the schedule are still selected. Click on the properties button and change any (can be more than one) element parameter for all of the items.

IT IS INTERESTING:  What is SOLIDWORKS certification?

How do you unsplit a schedule in Revit?

You can rejoin the sections of a split schedule on a sheet. When you select the schedule on a sheet, a 4-way arrow control displays in the upper left corner of each section of the schedule. Use this arrow control to drag and drop a section of the schedule over another section to join them.

What is an embedded schedule in Revit?

Use embedded schedules to display information about the components in rooms, spaces, duct systems, piping systems, or electrical circuits categories.

How do you apply conditional formatting in Revit?

Go to the Formatting menu of the schedule. Select the Name field and click on Conditional Format… Enter the formula like in the image and select a color override for fields that matches the criteria.

How do you combine Parameters in Revit?

Access the Combine Parameters dialog when creating or editing a schedule:

  1. To create a combined parameter, from the Schedule Properties dialog, click (Combine Parameters).
  2. To edit a combined parameter from the Schedule Properties dialog, select an existing combined parameter, and click (Edit parameter).

How do you cut a schedule in Revit?

Split a Schedule on a Sheet

  1. Open the sheet.
  2. Select the schedule on the sheet. …
  3. Click the Z break control. …
  4. To split a section of the schedule further, click the Z break control again. …
  5. To adjust the number of rows in a section of the schedule, drag the blue dot at the bottom of the first section.

How do you create a revision schedule in Revit?

Click View tab Create panel (Revision Schedule).



Specify sorting for the revision schedule, as follows:

  1. Click the Sorting/Grouping tab of the Revision Properties dialog.
  2. For Sort by, select Revision Sequence, and specify Ascending or Descending.
  3. Ensure that Itemize every instance is selected.
IT IS INTERESTING:  How do I make an azimuth in AutoCAD?

How do you change multiple text in Revit?

When text is replaced using Edit Group, it is replaced in all group instances.



  1. Select Annotate tab Text panel (Find/Replace).
  2. In the Find/Replace dialog, for Find, enter the text you want to replace.
  3. For Replace with, enter the new text.
  4. Under Scope, select the appropriate fields.
  5. Click Find Next, or Find All.