How do you hide old revision clouds in Revit?

How do you show revision clouds in Revit?

Click Annotate tab Detail panel (Revision Cloud). Revit enters sketch mode. On the Tools panel, click one of the draw tools. In the drawing area, place the cursor near the part of the view that has changed and draw the cloud to encompass the changed area.

How do you edit revision clouds in Revit?

Click Modify | Revision Clouds tab Mode panel (Edit Sketch).



  1. In the project, click Manage tab Settings panel (Object Styles).
  2. Click the Annotation Objects tab.
  3. For Revision Clouds, change the values for Line Weight, Line Color, and Line Pattern.
  4. Click OK. These changes apply to all revision clouds in the project.

Why do my revision clouds disappear in Revit?

The reason that the Revit Revision Box is non editable / greyed out on the sheet is because there is a cloud or series of clouds on the sheet that are not visible. To resolve this, go to the Manage Tab → Additional Settings → Sheet Issues / Revisions.

How do I delete revision clouds?

Remove a revision and all of the revision’s associated clouds and tags from the project.



Delete Revisions

  1. Click View tab Sheet Composition panel (Sheet Issues/Revisions).
  2. Click the sequence number for the revision you wish to delete. …
  3. Click Delete.
IT IS INTERESTING:  How do i publish a layout in autocad?

How do I turn off revisions in Revit?

Click View tab Sheet Composition panel (Sheet Issues/Revisions). Click the sequence number for the revision you wish to delete. Optionally, press and hold Ctrl, then click to select multiple sequence numbers to delete. Click Delete.

What controls the revision cloud arc length?

The Arc Length value controls the arc length for all existing and new revision cloud annotations in the project. This value sets the minimum arc length for the 2-arc segment that is used to draw the revision cloud annotation.

How do I change revision date in Revit?

Enter Revision Information

  1. In the project, click View tab Sheet Composition panel (Sheet Issues/Revisions). …
  2. To add a new revision, click Add. …
  3. In the revision row, for Numbering, select Numeric, Alphanumeric, or None.
  4. For Date, enter the date on which the revisions are made or will be sent for review.

Why I cant edit my Revit model?

The reason that the Revit Revision Box is non editable / greyed out on the sheet is because there is a cloud or series of clouds on the sheet that are not visible. To resolve this, go to the Manage Tab → Additional Settings → Sheet Issues / Revisions.

Special Project