How do you constrain in SOLIDWORKS?

How do I create a constraint in SolidWorks?

Click Options (Features toolbar) or Insert > FeatureWorks > Options . Click Dimensions/Relations and select Enable Auto Dimensioning of Sketches and Add constraints to sketch. Click OK.

What does constrained mean in SolidWorks?

Define constraints to specify the conditions that your design must satisfy. The constraints can be driven global variables or sensors for mass properties, dimensions, and simulation data.

How do I add a constraint in SolidWorks 2020?

On the Variable View tab or Table View tab of the design study, in Constraints section, do one of the following:

  1. Select a predefined sensor from the list.
  2. Select Add Sensor, define a sensor, and select the newly defined sensor from the list.

How do I show constraints in SolidWorks?

Click Tools > Sketch Settings, and toggle Automatic Relations. How do I toggle the display of sketch relations? (View toolbar) or View > Hide/Show > Sketch Relations to toggle the display of sketch relations.

How do I add a coincident constraint in Solidworks?

Click Constraints > Geometric Constraints > Coincident (or type GcCoincident). Specify the first constraint point on an entity (Line, linear PolyLine segment, Circle, Arc, PolyLine arc, Ellipse, or Spline). Specify the second constraint point on another entity.

IT IS INTERESTING:  How do you delete all sketch relationships in Solidworks?

How do I add a parallel constraint in Solidworks?

Click Constraints > Geometric Constraints > Parallel (or type GcParallel). Specify the first entity (Line, PolyLine segment, SimpleNote, or Note). The first entity is the one that maintains position, length, and orientation. Specify the second entity (Line, PolyLine segment, SimpleNote, or Note).

How do you create an offset plane in SolidWorks?

To create an offset plane, select the Reference Geometry drop down on the CommandManager and choose the Plane option. Once the option to create a plane is open, select a face or another plane and set a distance for the offset.

How do I edit a relationship in SolidWorks?

You can set different external sketch relations in specified configurations. Right-click a sketch in the FeatureManager design tree, and select Edit Sketch. Click Display/Delete Relations on the Dimensions/Relations toolbar, or click Tools > Relations > Display/Delete.

Where is add relation in SolidWorks?

(Dimensions/Relations toolbar) or Tools > Relations > Add to create geometric relations (such as tangent or perpendicular) between sketch entities, or between sketch entities and planes, axes, edges, or vertices. You can choose whether geometric relations are automatically created as you create sketch entities.

How do I add a coincident relationship in SolidWorks?

How to Add a Coincident in SolidWorks

  1. Select a line, point, center line or temporary axis with the left mouse button. …
  2. Hold the “Control” key and select the second line, point or temporary axis by left-clicking it. …
  3. Click the “Coincident” button in the Add Relations section of the properties box.

How do I convert entities in SolidWorks?

To convert an entity:

  1. In an open sketch, click a model edge, loop, face, curve, external sketch contour, set of edges, or set of curves. You can also click an entity after clicking the Convert Entities. …
  2. Click Convert Entities. …
  3. In the PropertyManager, click Select chain to convert all contiguous sketch entities. …
  4. Click .
IT IS INTERESTING:  How do I turn off guidelines in SketchUp?

How do you remove green marks in SolidWorks?

You can turn off visibility of the relations, click on the glasses icon and click View Sketch Relations and it will not remove any relation, it will just hide the icons, to make your job easier.

How do you break parent/child relationships in SolidWorks?

In the FeatureManager design tree, right-click the top-level assembly, and click one or both of the Dynamic Reference Visualization (Parent) and Dynamic Reference Visualization (Child) options. Select a component that has external references. Click the circle and then click Break Reference .

Special Project