How do I set ground level in Revit?

How do you change the datum level in Revit?

Change the Level Type

  1. On the ribbon, click (Level). Architecture tab Datum panel (Level) Structure tab Datum panel (Level)
  2. In the Type Selector, select a different level type.

How do you change level in Revit without moving model?

The first thing we want to do is select one of the levels, from the properties dialog select Edit Type, then duplicate the current level type and name it Shared. Change the value for the Elevation Base to Shared (prior to 2013), for 2013 change it to Survey Point. Select OK.

How do I change the elevation in Revit?

Change Elevations for a Site Element

  1. Open a site plan that displays the site element to modify. …
  2. Click Site Designer tab Modify panel, and click the tool for the element to modify.
  3. In the view, select the host line for the site element to modify. …
  4. In the Modify dialog, click Change Elevation. …
  5. Make the desired changes:

How can you change the elevation of a level?

Change the level name: Select the level and click the name box. Enter a new name for the level. Change the elevation: Select the level line, and click the elevation value. Enter a new value.

IT IS INTERESTING:  What is navigation bar in autocad?

How do you change level type in Revit?

Change the Level Type

  1. On the ribbon, click (Level). Architecture tab Datum panel (Level) Structure tab Datum panel (Level)
  2. In the Type Selector, select a different level type.

Why can’t I see my levels in Revit?

There can be many reasons that an element is not displayed within a Revit View. For levels to be visible in a section/elevation view, a portion of the level must exist within the view depth of the section or elevation.

How do I get my Revit level back?

Revit Tip – Finding Lost Levels

  1. Select the scope box tool in plan and draw a box to the full extents of your model.
  2. Go to an elevation and drag the boxes top and bottom points so the box contains all model elements.
  3. Draw a new level in elevation by either creating a new level or just copying an existing one up or down.

How do you manage levels in Revit?

Levels

  1. Set the Display to “Entire Project”.
  2. Set the Sort By to “Level”
  3. Set the filter to
  4. Select the elements you need to move.
  5. Look at the Properties palette for the Level property.
  6. If Level is an editable property for all elements, switch the level to the proper Level name.