How do I move a project base point in Revit?

How do I unclip a project base point?

Help

  1. Open the site plan view or another view that displays it. …
  2. To select the project base point, move the cursor over the symbol and look at the tooltip or the status bar. …
  3. If the project base point is clipped, click to unclip it.
  4. Drag the project base point to the desired location.

How do you select a project base point in Revit?

Help

  1. Open the desired view.
  2. Click View tab Graphics panel (Visibility/Graphics).
  3. On the Model Categories tab of the Visibility/Graphics dialog, scroll down to Site, and expand it.
  4. To display the project base point, select Project Base Point.
  5. To display the survey point, select Survey Point.

How do you unclip a project base point in Revit 2021?

You cannot delete the project base point. Project North defines the Y axis of the project base point. To ensure that the project base point does not move inadvertently, you can pin it by selecting the point and clicking Modify tab Modify panel (Pin).

IT IS INTERESTING:  How do I get rid of the Start menu in AutoCAD?

How do you change coordinates in Revit?

Relocate the Model by Specifying Coordinates

  1. Optional: Display the project base point and the survey point in the current view.
  2. Click Manage tab Project Location panel Coordinates drop-down (Specify Coordinates at Point).
  3. Place the cursor on a reference point of the model. …
  4. Click the reference.

How do you use project base point?

To make these points visible:

  1. Click View tab > Graphics panel > Visibility/Graphics.
  2. On the Model Categories tab of the Visibility/Graphics dialog, scroll down to Site. …
  3. To display the project base point, select Project Base Point.
  4. To display the survey point, select Survey Point.

How do you find the base point of a project?

Click View tab Graphics panel (Visibility/Graphics). On the Model Categories tab of the Visibility/Graphics dialog, scroll down to Site, and expand it. To display the project base point, select Project Base Point. To display the survey point, select Survey Point.

How do you move a project base point in Revit without moving a building?

Help

  1. In the site plan view or another view that displays the project base point, select the project base point.
  2. Drag the project base point to the desired location. …
  3. Optional: To ensure that the project base point does not move inadvertently, pin it in place by clicking Modify tab Modify panel (Pin).

Where is the survey point in Revit?

In Visibility / Graphics settings window go to Model Categories -> Visibility -> Site and make sure that “Survey Point” is enabled. After that in the Revit site view, the Survey Point block should appear.

IT IS INTERESTING:  How do I get rid of thick lines in Revit?

How do you unlock visibility graphics in Revit?

The Visibility/Graphics window will be greyed out (as shown above) if its included in the View Properties of the View Template. So make sure you go into the View Template and update the Visibility/Graphics or change settings to not included Visibility/Graphics.

What are the 3 points in Revit?

3- The Spot Coordinates, Spot Elevation and Levels tools set to “Survey Point” don’t actually reference the Survey Point, they refer to the Shared Site Origin. 4- Set the Shared Site Origin and Survey Point early on in the project.

What is the method to georeference a Revit file?

Revit 2018 now has the option to use the Geo-Referenced data from a CAD file that was used to Acquire Coordinate data. When you link and position a Geo-Referenced CAD file, you use the Acquire Coordinates feature in Revit to share coordinate system data between the Revit and CAD file.

How do I turn off coordinates in Revit 2020?

Use the Visibility / Graphic Overrides dialog to turn off display of the Internal Origin.

dyn.

  1. Open the Revit model in Revit 2020.2.
  2. Click Dynamo Player on Manage tab. …
  3. Click Edit Inputs command.
  4. Pick True to hide points.
  5. Click Run script.

How do I set shared coordinates in Revit?

To establish a common coordinate position and then share that position between files, use the Acquire Coordinates tool or the Publish Coordinates tool. Tip: You should derive shared coordinates from only one file. That one file defines the coordinates for all other files that compose the project.