How can duplicate with Dependent be used in Revit?

An example of using the “duplicate as dependent” option would be when a floor plan is too large for one sheet and is separated across multiple sheets. When the properties of the match line are changed in the parent view, it is also changed in both dependent views.

How can duplicate with Dependent be used?

Duplicate as Dependent



Duplicating as a dependent will create identical copies of the original view, the new views are also tied to the original view as child objects. What this means is if you add a dimension in the ordinal view all dependent views will also have the new dimension.

What does duplicate as a dependent mean in Revit?

Duplicate as a Dependent creates a copy of the view and links it to the original (parent) view, as shown in the Project Browser below. View-specific changes made to the overall view, such as changing the Scale, are also reflected in the dependent (child) views and vice-versa.

How do you duplicate with detailing in Revit?

To copy the model geometry from an existing view into a new view, right-click the existing view in the Project Browser, and click Duplicate View Duplicate. If you right-click, and click Duplicate View Duplicate with Detailing, both the model geometry and the detail geometry are copied into the new view.

IT IS INTERESTING:  How do I show dimension bar in SketchUp?

How do you duplicate floor plans in Revit?

Solution:

  1. Copy to Clipboard (CTRL+C) or from the Modify ribbon>Clipboard panel, choose Copy.
  2. On the Modify ribbon > Clipboard, click the drop down arrow under the Paste command.
  3. Select “Aligned to Selected Levels”
  4. Choose the Target level (i.e. Level 2)
  5. Switch to a 3D View to see the results.

What is a dependent view Revit?

Make multiple copies of a view that are dependent on the primary view. All copies, known as dependent views, remain synchronous with the primary view and all other dependent views, so that when view-specific changes (such as view scale and annotations) are made in one view, they are reflected in all views.

How do I change the view dependency in Revit?

You can convert a dependent view to an independent view. In the Project Browser, right-click a dependent view, and click Convert to independent view.

What type of view do you need to be in to add a level to your project?

Open the section or elevation view to add levels to. On the ribbon, click (Level). Place the cursor in the drawing area and click. Note: As you place the cursor to create a level, if the cursor aligns to an existing level line, a temporary vertical dimension displays between the cursor and that level line.

How do you make a view independent in Revit?

You can convert a dependent view to an independent view. In the Project Browser, right-click a dependent view, and click Convert to independent view.

How do I import a family from Revit to another project?

Load Families

  1. Click Insert tab Load from Library panel (Load Family).
  2. In the Load Family dialog, double-click the category of the family that you want to load.
  3. Preview any of the families (RFA) in the category: To preview a single family, select it from the list. …
  4. Select the family that you want to load, and click Open.
IT IS INTERESTING:  How do you animate in Autodesk?
Special Project