Frequent question: How do I move a 3D model in Revit?

How do I move an entire model in Revit?

Relocate the Model

  1. Click Manage tab Project Location panel Position drop-down (Relocate Project). The Relocate Project tool works similar to the Move tool. As you move the cursor over elements, valid references are highlighted and identified in the status bar.
  2. Move the project graphically in the view.

How do you move a structure in Revit?

Relocate a Project

  1. Click Manage tab Project Location panel Position drop-down (Relocate Project). You use the tool just like the Move tool.
  2. Move the project graphically in the view.. Note: If you have set levels or spot elevations to report values from the shared origin, their values update.

How do you move a coordination model in Revit?

Click Insert tab Link panel (Coordination Model). In the dialog, select the coordination model. To reload the selected model, click Reload. If the coordination model has been moved to a new folder or you want to reload it using a different edition of the file, click Reload From, and navigate to the target model.

How do you move a level in Revit without moving objects?

First be in a Section or Elevation View (any vertical view). Then in Manage tab, use Position and “Relocate project”. Click on work view, point (above or below), enter the distance, and press enter. Use “ZE”, zoom extents command.

IT IS INTERESTING:  What kind of shape in a sketch should be drawn to create a sphere Onshape?

How do you move internal origin in Revit?

To establish the project coordinate system, move the project base point away from the internal origin to another location, such as the corner of a building. If you later want to return the project base point to the internal origin, unclip the project base point, right-click it, and click Move to Startup Location.

How do you change building levels in Revit?

The first thing we want to do is select one of the levels, from the properties dialog select Edit Type, then duplicate the current level type and name it Shared. Change the value for the Elevation Base to Shared (prior to 2013), for 2013 change it to Survey Point. Select OK.

How do you scroll in Revit?

Simply press the Shift button and the central mouse button (scroll wheel) and move your mouse.

How do you pan in Revit?

To Pan just press and hold the wheel mouse button and you can Pan the scene. Just be careful when panning not to roll the wheel button or you will find yourself zooming in or out very quickly and could lose your place in the scene.

How do I find the coordination model in Revit?

When reloaded, the coordination model retains its position and orientation in relation to the Revit model.

  1. Click Insert tab Link panel (Coordination Model).
  2. In the dialog, select the coordination model.
  3. To reload the selected model, click Reload.

What is coordination model?

A coordination model is a 3D design used for virtual cross-checking of various disciplines through the design, pre-construction, and construction phases of a project. For the Coordination Model feature, use an NWD or NWC file.