Frequent question: How do I change the elevation tag size in Revit?

On the Manage ribbon, click Settings, then click “Elevation Tags”. Find the one you want to change (1/2″ Square or 1/2″ Circle, I’m guessing). always purge it later after you’re sure you don’t want it). Set the Width property to the size you want.

How do I change the elevation in Revit?

Change Elevations for a Site Element

  1. Open a site plan that displays the site element to modify. …
  2. Click Site Designer tab Modify panel, and click the tool for the element to modify.
  3. In the view, select the host line for the site element to modify. …
  4. In the Modify dialog, click Change Elevation. …
  5. Make the desired changes:

How do you make the elevation text smaller in Revit?

From the Modify label tab, click on Element properties > Type properties > Duplicate the existing text type; default is 1/8″ ; rename as, for example, ‘ 3/32″ ‘, then change the text value to be actually 3/32″. Now do the same with the “Elevation” label. Once you are done with this, click on Load into Project.

How do you change the scale of annotations in Revit?

In the Modify dialog, click Change View Scale. In the Change View Scale dialog, enter the desired scale and click OK. The size of text annotations in the view adjust accordingly.

IT IS INTERESTING:  What is 2d drafting AutoCAD?

How do I move multiple levels in Revit?

To move the selected level up or down, click the temporary dimension, type a new value, and press ENTER . Drag the selected level line up or down. To move multiple level lines, select the desired number of level lines and move them up or down.

How do you change absolute level in Revit?

Manage tab> Project Location> Coordinates> Specify Coordinates at Point:

  1. Select the ground level line and specify elevation:
  2. Ground level still says 0. Select the ground level line and change the type to Shared Datum:
  3. Ground level now shows the Shared Datum levels:

How do you change the level in Revit?

Change the Level Type

  1. On the ribbon, click (Level). Architecture tab Datum panel (Level) Structure tab Datum panel (Level)
  2. In the Type Selector, select a different level type.

How do you manage levels in Revit?

Levels

  1. Set the Display to “Entire Project”.
  2. Set the Sort By to “Level”
  3. Set the filter to
  4. Select the elements you need to move.
  5. Look at the Properties palette for the Level property.
  6. If Level is an editable property for all elements, switch the level to the proper Level name.

How do I move an entire model in Revit?

Relocate the Model

  1. Click Manage tab Project Location panel Position drop-down (Relocate Project). The Relocate Project tool works similar to the Move tool. As you move the cursor over elements, valid references are highlighted and identified in the status bar.
  2. Move the project graphically in the view.
IT IS INTERESTING:  How do you tell if safety glasses are ANSI approved?
Special Project