Do construction specifications supercede drawings?

Supplement 5252.236-9312, Design Build Contract-Order of Precedence, which showed that specifications took precedence over concept drawings. General requirements, which stated “in case of differences between project specifications and the accompanying drawings, the specifications will govern.”

Do specifications supersede drawings?

If there is a conflict between the Drawings and Details on Drawings and the Specifications, then the Specifications will prevail. The higher “Order of Precedence of Documents” governs or prevails. … This only works if you have a CONFLICT NOT AN OMMISSION.

What is the relationship between specification document and drawing?

13.1 General—Overview. Working drawings and specifications are the primary working documents used by a contractor to bid and execute a project. Specifications are the written documents that go with the construction documents and describe the materials as well as the installation methods.

What is the difference between construction drawings and specifications?

Your house plans are a set of scaled drawings that show contractors what they are building. Your specifications (or specs) are a written document that details what materials will be used and how to install things.

What is the major difference between drawings and specifications?

Construction drawings are generally computer generated which shows plan, section and elevation. By definition, drawing notes that describe materials, equipment, systems, standards, or workmanship are specifications.

IT IS INTERESTING:  How do you bring something to the front in Revit?

What do you mean by precedence?

1a : priority of importance your safety takes precedence. b : the right to superior honor on a ceremonial or formal occasion. c : the order of ceremonial or formal preference.

What are the two main types of working drawings?

A working drawing is a part of production information provided by the designers to the construction team to help construct a project. Production information is of two types: working drawing and construction drawing. Working drawings provide graphical, and dimensioned information.

What are the 6 types of construction drawings?

What Are the Six Types of Construction Drawings?

  • Plans.
  • Interior and exterior elevations.
  • Building and wall sections.
  • Interior and exterior details.
  • Schedules and room finishes.
  • Framing and utility plans.

What drawings do builders need?

For most projects, you’ll need the following types of construction drawings to apply for planning permission or a lawful development certificate:

  • Existing floor plans. These are accurate drawings of what the building looks like as it stands today. …
  • Design floor plans. …
  • Elevations.

How long do construction drawings take?

For small alterations, renovations or additions, the construction stage could take 3 to 6 months. A typical new residential project of a significant size will take from between 6 to 9 months for construction.

What is the relationship between the working drawings and the specifications?

Working drawing represents actual plan of the project. Technical specification is a written instruction about quality of the material.